Kestrel compression station
Connecting design intent with the realities of a live construction site.

The brief.
Develop an illustrative compression station around a coordinated package of civil, mechanical, electrical and control-system requirements. The project connects new equipment with an established gas infrastructure corridor.
Where the decisions connect.
The main interface is between equipment layout and construction access. Pipe routes, lifting positions and maintenance clearances have to be considered together, before the site sequence is fixed.
A coordinated way forward.
The example delivery team combines layout reviews with construction planning. Equipment packages are checked against civil interfaces, while the installation sequence informs the timing of design information and material deliveries.
Project scope
- Multidisciplinary layout coordination
- Civil and structural design interfaces
- Mechanical installation planning
- Electrical and controls integration
- Construction work-package preparation
What the dossier makes clear.
- A coordinated design basis records the assumptions shared across disciplines.
- Construction packages identify the information, materials and access needed for each area.
- A system-based handover structure is established before mechanical completion.
Planning something similar?
Tell us what you are planning.
We will help define the next step.
